Solare-datensysteme Solar-Log Manual de usuario Pagina 280

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 311
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 279
280
TBEA
TBEA
Procedure
1. Insert the round plug into the COM round socket 1 on inverter 1
2. Connect additional inverters to each other according to the inverter instructions
3. Terminate in the last inverter according to the inverter instructions.
Allocate communication address
•
Recommendation: Continuous numbering starting with 1.
Address range 1 - 247.
•
Setting: Using the inverter’s operating display
•
Procedure: Start according to the inverter’s instructions
Note
Both bus ends have to be terminated.
Vista de pagina 279
1 2 ... 275 276 277 278 279 280 281 282 283 284 285 ... 310 311

Comentarios a estos manuales

Sin comentarios