Solare-datensysteme Solar-Log Manual de usuario Pagina 209

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 311
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 208
209
Schüco
IPE SN series
Procedure
1. Open the inverter as shown in the inverter‘s instructions.
2. Connect terminals RS485+ and RS485- on all inverters to the two data cable wires in accordance with
the inverter instructions.
3. Terminate in the last inverter in accordance with the inverter instructions.
4. Close inverters.
Allocate communication address
•
Recommendation: Continuous numbering starting with 1.
•
Setting: Using the inverter operating display
•
Procedure: Start according to the inverter‘s instructions
Vista de pagina 208
1 2 ... 204 205 206 207 208 209 210 211 212 213 214 ... 310 311

Comentarios a estos manuales

Sin comentarios