Solare-datensysteme Solar-Log Manual de usuario

Busca en linea o descarga Manual de usuario para Accesorios para el aire Solare-datensysteme Solar-Log. Solare Datensysteme Solar-Log User Manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 311
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente

Indice de contenidos

Pagina 1 - Solar-Log™

1 Inverter Installation ManualSolar-Log™ EN

Pagina 2

10 67 Riello ������������������������������������������������������������������������������������������������������������������������������19067�1 Ri

Pagina 3 - Table of Contents

100EvocoEvoco29 Evoco29�1 EvocoEasy Installation Termination Addressing InterfaceNoYesYesRS485Overview•Integrated interface•Where to connect: Betwe

Pagina 4

101EvocoEvocoProcedure1. Insert the round plug into any round socket on inverter 1.2. Insert the other end of the cable into any round socket on inv

Pagina 5

102FroniusFronius with ComCard30 Fronius30�1 Fronius with ComCardEasy Installation Termination Addressing InterfaceYesConnection plugBridge 4-3 + 5-6

Pagina 6

103FroniusFronius with ComCardProcedure1. If you are making the cable yourself, connect the wires as shown in the following diagram: Solar-Log™ termi

Pagina 7

104FroniusFronius Symo and Galvo models30�2 Fronius Symo and Galvo modelsFor the Symo and Galvo series, Fronius offers two different inverters:•Symo

Pagina 8

105FroniusFronius RL30�3 Fronius RLEasy Installation Termination Addressing InterfaceYesJumperYesRS485Overview•Integrated interface•Where to connec

Pagina 9

106GefranGefran31 Gefran31�1 GefranEasy Installation Termination Addressing InterfaceNo Switch YesRS485 Overview•Integrated interface (two independ

Pagina 10

107GefranGefranProcedure1. Open the inverter as shown in the inverter’s instructions.2. If you are making the cable yourself, connect the wires as s

Pagina 11

108GefranGefranConnect the inverters to each other•Where to connect: Terminal strip inside the inverter•2-pin wiringProcedure1. Open the inverter a

Pagina 12

109General Electric inverters (GE)General Electric inverters (GE)32 General Electric inverters (GE)32�1 General Electric inverters (GE)Easy Installat

Pagina 13

11 76 SMA �������������������������������������������������������������������������������������������������������������������������������22076�1 Over

Pagina 14

110GESOLARGESOLAR33 GESOLAR33�1 GESOLAREasy Installation Termination Addressing InterfaceNo Yes NoRS485Overview•Integrated interface•Where to conne

Pagina 15 - 1 Connections

111GESOLARGESOLARConnect the inverters to each other•Connect using a network cable (patch cable)•Where to connect: RJ45 sockets on the outside of th

Pagina 16 - 1�2 RJ45

112GinlongGinlong34 Ginlong34�1 GinlongEasy Installation Termination Addressing InterfaceNo Yes YesRS485Overview•Integrated interface•Where to conn

Pagina 17 - 1�3 RJ11 Configuration

113GinlongGinlongAllocate communication address•Recommendation: Continuous numbering starting with 1.•Default settings on the inverter: Communicatio

Pagina 18 - 2 Connecting the inverters

114GMDEGMDE35 GMDE35�1 GMDEEasy Installation Termination Addressing InterfaceNo Yes NoRS485Overview•Integrated RS485 interface•8-pin cable for the

Pagina 19 - Switching the Solar-Log™ off

115GMDEGMDEConnect the inverters to each other•Connect using a network cable (patch cable).•Where to connect: RJ45 socket on the outside of the inve

Pagina 20 - 3�1 ABB PVS300

116GoodWeGoodWe36 GoodWe36�1 GoodWeEasy Installation Termination Addressing InterfaceNo Yes NoRS422Overview•Integrated RS422 interface•8-pin cable

Pagina 21

117GoodWeGoodWeConnect the inverters to each other•Connect using a network cable (patch cable).•Where to connect: RJ45 socket on the outside of the

Pagina 22 - 3�2 ABB Central Inverters

118GrowattGrowatt37 Growatt37�1 GrowattEasy Installation Termination Addressing InterfaceNo - YesRS485Overview•Integrated interface•Where to connec

Pagina 23 - ► 4 ► -T/R (PC)

119GrowattGrowattAllocate communication address•Recommendation: Continuous numbering starting with 1.•Address range: 1 - 125 •Setting: Using the in

Pagina 24

12 84 Sungrow ����������������������������������������������������������������������������������������������������������������������26084�1 Sungrow �

Pagina 25 - 4 Advanced Energy

120GTecGTec38 GTe c38�1 GTecEasy Installation Termination Addressing InterfaceNo Yes NoRS422Overview•Interface not integrated; Retrofit RS485 interf

Pagina 26 - Advanced Energy

121GTecGTecProcedure1. Open the inverter as shown in the inverter's instructions.2. Pull the free wires through the wire opening in the inverte

Pagina 27 - 4�2 Advanced Energy - AE-3

122Helios SystemsHelios Systems39 Helios Systems39�1 Helios SystemsEasy Installation Termination Addressing InterfaceNo Yes YesRS485String Inverter H

Pagina 28

123Helios SystemsHelios SystemsConnect the inverters to each other•Connect using a network cable (patch cable)•Where to connect: 2 RJ45 sockets Proc

Pagina 29 - 4�3 Advanced Energy - AE-TX

124HuaweiHuawei40 Huawei40�1 HuaweiEasy Installation Termination Addressing InterfaceNo Yes YesRS485Overview•Integrated interface•Where to connect:

Pagina 30

125HuaweiHuaweiConnect the inverters to each other•Connect using a network cable (patch cable)•Where to connect: 2 RJ45 sockets Procedure•Open the

Pagina 31 - 5�1 AEG PS

126HyundaiHyundai HPC-050HT-E and HPC-100HT-E41 Hyundai41�1 Hyundai HPC-050HT-E and HPC-100HT-EEasy Installation Termination Addressing InterfaceNo Y

Pagina 32

127HyundaiHyundai HPC-050HT-E and HPC-100HT-EConnect the inverters to each other•Connect using a network cable (patch cable)•Where to connect: RJ45

Pagina 33 - 5�2 AEG Protect

128HyundaiHyundai HPC-250HT-E41�2 Hyundai HPC-250HT-EEasy Installation Termination Addressing InterfaceNo Yes YesRS485Overview•Integrated interface•

Pagina 34

129HyundaiHyundai HPC-250HT-EProcedure1. Connect terminal D1+/TxD1+ on inverter 1 to terminal D1+/TxD1+ on inverter 2.2. Connect terminal D1–/TxD1–

Pagina 35 - 6 Albatech

13 94 Valenia ������������������������������������������������������������������������������������������������������������������������� 28594�1 Valen

Pagina 36 - ► 4 (Data-) ► 16 (RS485 -)

130IngeteamIngeteam42 Ingeteam42�1 IngeteamEasy Installation Termination Addressing InterfaceNoJumper P3YesRS485Overview•Interface not integrated; R

Pagina 37 - 6�2 Albatech APL Monofase

131IngeteamIngeteamConnect the inverters to each other•Connect using a 3 wire, shielded data cable•Where to connect: Terminal strip inside the inver

Pagina 38 - Albatech

132KacoKaco - Powador43 Kaco43�1 Kaco - PowadorEasy Installation Termination Addressing InterfaceYesYesYesRS485Overview•Integrated interface•Where

Pagina 39 - 7 ALPHA-SOL

133KacoKaco - PowadorConnect the inverters to each other•Connect using a 2 wire, shielded data cable•Where to connect: Terminal strip inside the inv

Pagina 40

134KacoKaco – PVI Blue Planet43�2 Kaco – PVI Blue PlanetEasy Installation Termination Addressing InterfaceYesSwitchYesRS485Overview•The Solar-Log™ o

Pagina 41 - ALPHA-SOL

135KacoKaco – PVI Blue PlanetProcedure1. Open the inverter as shown in the inverter's instructions.2. Connect the data cable to the free termin

Pagina 42 - 8 AROS Solar Technology

136KLNEKLNE (Solartec and Sunteams)44 KLNE44�1 KLNE (Solartec and Sunteams)Easy Installation Termination Addressing InterfaceNo Yes YesRS485Overview•

Pagina 43

137KLNEKLNE (Solartec and Sunteams)Solar-Log™ terminal strip connector X4 socket inverterTerminal PIN ► 14 - Data+ ► 42 - Data-3. Connect the Solar-L

Pagina 44 - ► 4 ► B (-)

138Kostal and Solar-FabrikKostal Pico and Solar-Fabrik Inverter Convert T (RS485)45 Kostal and Solar-Fabrik45�1 Kostal Pico and Solar-Fabrik Inverter

Pagina 45 - AROS Solar Technology

139Kostal and Solar-FabrikKostal Pico and Solar-Fabrik Inverter Convert T (RS485)Procedure1. Open the inverter as shown in the inverter's instru

Pagina 46 - 9 Astronergy

14 104 Appendix ��������������������������������������������������������������������������������������������������������������������308104�1 SMA mix

Pagina 47 - Astronergy

140Kostal and Solar-FabrikKostal Ethernet Version45�2 Kostal Ethernet VersionEasy Installation Termination Addressing InterfaceNo No YesLANOverview•

Pagina 48 - 10�1 Aten

141Kostal and Solar-FabrikKostal Ethernet VersionNote Each inverter must be accessible through the network individually.It is thereby necessary to ac

Pagina 49

142KstarKstar Multitracker46 Kstar46�1 Kstar MultitrackerEasy Installation Termination Addressing InterfaceNoDIP switchYesRS485Select “Kstar” during

Pagina 50 - 11 Benning

143KstarKstar MultitrackerProcedure1. If you are fabricating the cable yourself, connect the wires as shown in the following diagram.Solar-Log™ termi

Pagina 51

144KstarKstar Singletracker46�2 Kstar SingletrackerEasy Installation Termination Addressing InterfaceNoDIP switchYesRS485Select “Kstar SM” during the

Pagina 52 - 12�1 Bonfiglioli

145KstarKstar SingletrackerConnect the inverters to each other•Connect using a network cable (patch cable) (No Crossover cable)•Where to connect: RJ

Pagina 53 - 3-pin wiring

146Kyocera Inverter/Battery SystemKyocera Inverter/Battery System47 Kyocera Inverter/Battery System47�1 Kyocera Inverter/Battery SystemEasy Installat

Pagina 54 - 13 Carlo Gavazzi

147Kyocera Inverter/Battery SystemKyocera Inverter/Battery SystemAllocate communication address:•Procedure: According to the manufacturer‘s manual.If

Pagina 55 - Carlo Gavazzi

148Lufft - PyranometerLufft - Pyranometer48 Lut - Pyranometer48�1 Lut - PyranometerEasy Installation Termination Addressing InterfaceNo - No*RS485S

Pagina 56 - ► 4 B/Data- ► 2 T/R 1

149MastervoltMastervolt (RS485)49 Mastervolt49�1 Mastervolt (RS485)Easy Installation Termination Addressing InterfaceYesYesNoRS485Overview•Integrate

Pagina 57

15ConnectionsSolar-Log™ RS485/422 B connection assignments (6 pin)1 Connections1�1 Solar-Log™ RS485/422 B connection assignments (6 pin)The RS485/42

Pagina 58 - 14 Chint Power

150MastervoltMastervolt (RS485)CautionRisk of damage to the unit! The Solar-Log™ also has an RJ45 socket, which must never be connected to the RJ45 so

Pagina 59 - ► 6 ► Pin 2

151MitsubishiMitsubishi with RS485 interface50 Mitsubishi50�1 Mitsubishi with RS485 interfaceEasy Installation Termination Addressing InterfaceNoSwit

Pagina 60 - 14�2 Chint Power (CPS 20k+)

152MitsubishiMitsubishi with RS485 interfaceProcedure1. Unscrew the front plate of the inverter as shown in the inverter's instructions.2. Inse

Pagina 61 - Chint Power

153MotechMotech (RS485)51 Motech51�1 Motech (RS485)Easy Installation Termination Addressing InterfaceNo Yes NoRS485Overview•Integrated interface•W

Pagina 62 - 14�3 Chint Power Modbus

154MotechMotech (RS485)Connect the inverters to each other•Connect using a network cable (patch cable)•Where to connect: RJ45 sockets on the outside

Pagina 63 - ► 1 ► 1 (+)

155OelmaierOelmaier52 Oelmaier52�1 OelmaierEasy Installation Termination Addressing InterfaceNo Yes YesRS485Overview•Integrated interface•Where to

Pagina 64 - 15�1 CMS

156OelmaierOelmaierProcedure1. Open the inverter as shown in the inverter's instructions.2. If you are making the cable yourself, connect the w

Pagina 65

157OmnikOmnik53 Omnik53�1 OmnikEasy Installation Termination Addressing InterfaceNoNoAutomaticRS422Overview•Integrated interface•Where to connect:

Pagina 66 - 16 Conergy

158OmnikOmnikProcedure1. Connect the wires for the cable connection as shown in the following diagram.Solar-Log™ terminal strip connector RJ45 invert

Pagina 67

159OmronOmron54 Omron54�1 OmronEasy Installation Termination Addressing InterfaceNo Bridge 9 -> 10 YesRS485Overview•Integrated interface•Where t

Pagina 68 - 17 CyberPower

16ConnectionsRJ451�2 RJ45Some inverter manufacturers use RJ45 jacks on their units. The pin assignments are manufacturer-specific. Connect the RS485/

Pagina 69 - CyberPower

160OmronOmronProcedure1. Open the inverter as shown in the inverter's instructions.Inverter n Inverter n+1Terminal strip TB401 Terminal strip TB

Pagina 70 - 18 Danfoss

161PairanPairan55 Pairan55�1 PairanEasy Installation Termination Addressing InterfaceNo Jumper NoRS485Overview•Integrated interface•Where to connec

Pagina 71

162PairanPairanConnect the inverters to each other•Connect using a 2 wire, shielded data cable•Where to connect: Round socket on inverterProcedure1.

Pagina 72 - 19 Delta

163PhoenixtecPhoenixtec56 Phoenixtec56�1 PhoenixtecEasy Installation Termination Addressing InterfaceYesYesNoRS422Selectable under SunvilleOverview•

Pagina 73

164PhoenixtecPhoenixtecProcedure1. Open the inverter as shown in the inverter‘s instructions.2. Pull the free wires through the wire opening in the

Pagina 74 - 20 Diehl Ako

165PhonosolarPhonoCube 7.2 (Battery Hybrid System)57 Phonosolar57�1 PhonoCube 7�2 (Battery Hybrid System)Easy Installation Termination Addressing Int

Pagina 75 - 21 Eaton

166PhonosolarPhonoCube 7.2 (Battery Hybrid System)Procedure1. Unscrew the cover according to the PhoneCube instructions.2. If you are fabricating th

Pagina 76

167Platinum (formerly Diehl Ako)Platinum with RS485 interface58 Platinum (formerly Diehl Ako)58�1 Platinum with RS485 interfaceEasy Installation Term

Pagina 77 - 22�1 EEI

168Platinum (formerly Diehl Ako)Platinum with RS485 interfaceConnect the inverters to each other•Connect using a network cable (patch cable)•Where t

Pagina 78 - 23 Eekta

169Platinum (formerly Diehl Ako)Platinum H58�2 Platinum HEasy Installation Termination Addressing InterfaceNoYesYesRS485Overview•Integrated interfac

Pagina 79

17ConnectionsRJ11 Configuration1�3 RJ11 ConfigurationSome inverter manufacturers use RJ11 jacks on their units.The pin assignments are manufacturer-sp

Pagina 80 - 23�2 Eekta KS Multitracker

170Platinum (formerly Diehl Ako)Platinum HOther configurations•Activate the RS485 interface Using the inverter operating display.Note Pay particular

Pagina 81

171PowercomPowercom59 Powercom59�1 PowercomEasy Installation Termination Addressing InterfaceNoSwitchYesRS485Overview•Interface not integrated; Retr

Pagina 82 - 23�3 Eekta KS Singletracker

172PowercomPowercomExample - Communication address 3:OnOffDIP switchExample - Communication address 4:OnOffDIP switchExample - Communication address 5

Pagina 83

173PowercomPowercomSolar-Log™ terminal strip connector Inverter terminal stripTerminal PIN ► 1 ► R+ ► 1 ► T+ ► 4 ► R- ► 4 ► T-4. Close the invert

Pagina 84 - 24 Enfinity

174Power-One/AuroraPower-One/Aurora60 Power-One/Aurora60�1 Power-One/AuroraEasy Installation Termination Addressing InterfaceYesSwitchYesRS485Overvie

Pagina 85 - Enfinity

175Power-One/AuroraPower-One/AuroraProcedure1. Open the inverter as shown in the inverter's instructions.2. Connect terminals +T/R, -T/R and RT

Pagina 86 - 25�1 EHE N1k5TL to N50kTL

176PrimeVOLTPrimeVOLT61 PrimeVOLT61�1 PrimeVOLTEasy Installation Termination Addressing InterfaceNo DIP switch YesRS485Overview•Integrated interfac

Pagina 87 - EHE N1k5TL to N50kTL

177PrimeVOLTPrimeVOLTProcedure1. Open the inverter as shown in the inverter's instructions.2. If you are making the cable yourself, connect the

Pagina 88 - 25�2 EHE N10k to N100k

178PVPoweredPV Powered – central inverter RS48562 PVPowered62�1 PV Powered – central inverter RS485Easy Installation Termination Addressing Interface

Pagina 89 - EHE N10k to N100k

179PVPoweredPV Powered – central inverter RS485Connect the inverters to each otherThe wiring is done using a•self-made connection cable and terminal

Pagina 90 - 25�3 EHE N250k to N500k-TL

18Connecting the invertersRJ11 Configuration2 Connecting the invertersAs each inverter manufacturer uses different wiring connections and connectors,

Pagina 91 - Notes on inverter addresses

180PVPoweredPV Powered - string inverter62�2 PV Powered - string inverterEasy Installation Termination Addressing InterfaceNo - YesLANOverview•Integ

Pagina 92 - 26 EKO Energy

181Q3Q3 (RS485)63 Q363�1 Q3 (RS485)Easy Installation Termination Addressing InterfaceNo Yes YesRS485Overview•Integrated interface•Where to connect:

Pagina 93 - EKO Energy

182Q3Q3 (RS485)Allocate communication address•Recommendation: Continuous numbering starting with 1.•Default settings on the inverter: Communication

Pagina 94 - 27 Eltek

183REFUSOLREFUSOL64 REFUSOL64�1 REFUSOLEasy Installation Termination Addressing InterfaceYesTerminating plugYesRS485Overview•Integrated interface•W

Pagina 95

184REFUSOLREFUSOLConnect the inverters to each other•Connect using – 2-wire, shielded data cable and – 4-pin "SACC-M12MS-4SC" plug (two

Pagina 96 - 27�2 Eltek central inverter

185REFUSOLREFUSOLSet the following parameters on the inverter's operating display:1. Press "F1"2. Select Numerical list, press "E

Pagina 97 - Eltek central inverter

186REPREP65 REP65�1 REPEasy Installation Termination Addressing InterfaceNo DIP switch YesRS485Overview•Integrated interface•Where to connect: Term

Pagina 98 - 28 Europa-Solar AG

187REPREPProcedure1. Open the inverter as shown in the inverter's instructions.2. If you are making the cable yourself, connect the wires as sh

Pagina 99 - Europa-Solar AG

188ReverberiReverberi (EDI Series)66 Reverberi66�1 Reverberi (EDI Series)Easy Installation Termination Addressing InterfaceNo Yes YesRS485Overview•I

Pagina 100 - 29 Evoco

189ReverberiReverberi (EDI Series)Procedure•Open the inverter as shown in the inverter's instructions.•Connect the other inverters to each othe

Pagina 101 - Procedure

19Connecting the invertersSwitch off the inverters and Solar-Log™.2�1 Switch o the inverters and Solar-Log™�Switching inverters offAlways turn off a

Pagina 102 - 30 Fronius

190RielloRiello67 Riello67�1 RielloEasy Installation Termination Addressing InterfaceNoYesNoRS422Overview•Interface not integrated; Retrofit RS485 i

Pagina 103 - ► 6 ► 6

191RielloRielloProcedure1. Open the inverter as shown in the inverter's instructions.2. Pull the free wires through the wire opening in the inv

Pagina 104 - » Please check the setting

192SALICRUSALICRU EQX68 SALICRU68�1 SALICRU EQXEasy Installation Termination Addressing InterfaceNoYesNoRS422Overview•Interface not integrated; Retr

Pagina 105 - 30�3 Fronius RL

193SALICRUSALICRU EQXProcedure1. Open the inverter as shown in the inverter's instructions.2. Pull the free wires through the wire opening in t

Pagina 106 - 31 Gefran

194SALICRUSALICRU EQXLV68�2 SALICRU EQXLVEasy Installation Termination Addressing InterfaceNoResistorYesRS485Overview•Integrated interface•2-pin wi

Pagina 107

195Samil PowerSamil Power69 Samil Power69�1 Samil PowerEasy Installation Termination Addressing InterfaceNo - NoRS422Overview•Integrated interface•

Pagina 108 - 2-pin wiring

196Samil PowerSamil PowerNote:The wiring above refers to the RJ45 or RJ11 socket.3. Insert the RJ1plug into any RJ11 socket on inverter 1.4. Close t

Pagina 109 - No No No

197SanternoSanterno70 Santerno70�1 SanternoEasy Installation Termination Addressing InterfaceNoYesYesRS485Overview•Integrated interface•Where to co

Pagina 110 - 33 GESOLAR

198SanternoSanternoProcedure1. Insert the Santerno inverter data cable plug into socket B of the first inverter.2. Insert the Santerno inverter data

Pagina 111

199Schneider ElectricSchneider Electric SunEzy71 Schneider Electric71�1 Schneider Electric SunEzyEasy Installation Termination Addressing InterfaceN

Pagina 112 - 34 Ginlong

2 Publisher:Solare Datensysteme GmbHFuhrmannstr. 972351 Geislingen-BinsdorfGermanyInternational supportTel.:+49 7428 9418 -640Fax:+49 7428 9418 -280e

Pagina 113

20ABBABB PVS3003 ABB3�1 ABB PVS300Easy Installation Termination Addressing InterfaceNo Yes YesRS485Select “ABB-PVS” during the inverter detectionOve

Pagina 114 - 35�1 GMDE

200Schneider ElectricSchneider Electric SunEzyNote Only connect inverter using the RS485/422 B interface.Procedure1. Open the inverter as shown in th

Pagina 115

201Schneider ElectricSchneider Electric Xantrex GT30E71�2 Schneider Electric Xantrex GT30EEasy Installation Termination Addressing InterfaceNo - NoSu

Pagina 116 - 36 GoodWe

202Schneider ElectricSchneider Electric Conext71�3 Schneider Electric ConextEasy Installation Termination Addressing InterfaceNo - YesRS485Overview•

Pagina 117

203Schneider ElectricSchneider Electric ConextProcedure1. Open the inverter as shown in the inverter's instructions.2. Insert the RJ45 plug int

Pagina 118 - 37 Growatt

204SchücoIPE CN series72 Schüco72�1 IPE CN seriesEasy Installation Termination Addressing InterfaceYesTerminating plugYesRS485 Selectable under RefuS

Pagina 119 - Address range: 1 - 125

205SchücoIPE CN series4. Insert the terminal block connector into the Solar-Log™ RS485 socket.Connect the inverters to each other•Connect using – 2

Pagina 120 - 38 GTe c

206SchücoIPE CT series72�2 IPE CT seriesEasy Installation Termination Addressing InterfaceNo DIP switch YesRS485 Selectable under Bonfiglioli Overvie

Pagina 121

207SchücoIPE CT seriesProcedure1. Get access to the inverter interface2. If you are making the cable yourself, connect the wires as shown in the fol

Pagina 122 - 39 Helios Systems

208SchücoIPE SN series72�3 IPE SN seriesEasy Installation Termination Addressing InterfaceYesYesYesRS485 Selectable under SunwaysOverview•Integrated

Pagina 123

209SchücoIPE SN seriesProcedure1. Open the inverter as shown in the inverter‘s instructions.2. Connect terminals RS485+ and RS485- on all inverters

Pagina 124 - 40 Huawei

21ABBABB PVS300Procedure1. Unscrew the side cover as shown in the inverter's instructions.2. Connect the self-made RS-485 cable to the X4 termi

Pagina 125

210SchücoSchüco SGI series (RS485)72�4 Schüco SGI series (RS485)Easy Installation Termination Addressing InterfaceNoTerminating plugYesRS485 Selectab

Pagina 126 - 41 Hyundai

211SchücoSchüco SGI series (RS485)Connect the inverters to each other•Connect using a network cable (patch cable)•Where to connect: RJ45 sockets on

Pagina 127

212ShindengenShindengen73 Shindengen73�1 ShindengenEasy Installation Termination Addressing InterfaceNo Yes YesRS485 Overview•Integrated interface•

Pagina 128 - 41�2 Hyundai HPC-250HT-E

213ShindengenShindengenProcedure1. Open the inverter as shown in the inverter’s instructions.2. If you are fabricating the cable yourself, connect t

Pagina 129

214SIELSIEL (single phase)74 SIEL74�1 SIEL (single phase)Easy Installation Termination Addressing InterfaceNoYesYesRS485Overview•Interface not integ

Pagina 130 - 42 Ingeteam

215SIELSIEL (single phase)Example - Communication address 3:OnOffDIP switchExample - Communication address 4:OnOffDIP switchExample - Communication ad

Pagina 131 - Ingeteam

216SIELSIEL (single phase)3. If only one inverter is to be connected terminate this in accordance with the inverter instructions.4. Close the invert

Pagina 132 - 43�1 Kaco - Powador

217SiemensSiemens75 Siemens75�1 SiemensEasy Installation Termination Addressing InterfaceYes Resistor YesRS485Overview•Integrated interface•Where t

Pagina 133

218SiemensSiemensUse the SACC-M12MS-4SC connectors supplied with the inverter for data cables.•Connect them as shown in the diagram.•Connect the bus

Pagina 134 - 43�2 Kaco – PVI Blue Planet

219SiemensSiemensSolar-Log™ compatibility with older PVM installationsWith older Solar-Log™ / PVM installations the inverter had to be set with additi

Pagina 135

22ABBABB Central Inverters3�2 ABB Central InvertersEasy Installation Termination Addressing InterfaceNo - YesLANSelect “ABB-PVS” during the inverter

Pagina 136 - 2 - Data

220SMAOverview76 SMA76�1 OverviewSMA inverters do not have an integrated RS485 interface.However, the following RS485 interfaces can be retrofitted t

Pagina 137

221SMASMA connection using special RS485 piggyback card76�2 SMA connection using special RS485 piggyback cardEasy Installation Termination Addressing

Pagina 138 - 45 Kostal and Solar-Fabrik

222SMASMA connection using special RS485 piggyback cardProcedure1. Pull the free wires through the wire opening in the inverter.2. If you are making

Pagina 139 - ► 4 ► B

223SMASMA connection using special RS485 piggyback cardProcedure1. Pull the wire in the inverter through the insulation sleeve attached to the piggy

Pagina 140 - 45�2 Kostal Ethernet Version

224SMAConnect SMA with original SMA RS485 piggy back and the SMA RS485 data module76�3 Connect SMA with original SMA RS485 piggy back and the SMA RS4

Pagina 141 - Kostal Ethernet Version

225SMAConnect SMA with original SMA RS485 piggy back and the SMA RS485 data module5. Ground the connection: Connect terminal 5 on the inverter to the

Pagina 142 - 46 Kstar

226SMASMA Bluetooth mode76�4 SMA Bluetooth modeEasy Installation Termination Addressing InterfaceYesResistor jumperNoRS485Bluetooth mode is only poss

Pagina 143 - ► 3 GND ► Pin 5 GND

227SMASMA Meter Connection Box76�5 SMA Meter Connection BoxAn energy meter with S0 output can be connected to the SMA Meter Connection Box. The Meter

Pagina 144 - 46�2 Kstar Singletracker

228SMASMA Speedwire76�6 SMA SpeedwireNoteThe trademark "Speedwire" is registered trademark of SMA Solar Technology AG in many countries.Eas

Pagina 145 - No Crossover cable)

229SMASMA SpeedwireAssigning IP addresses•A static IP address has to be assigned to the inverter. This is set to automatic by default. Please refer t

Pagina 146 - ► 4 Data- ► 4 Data

23ABBABB-Power-One/Aurora/PVI/TRIO/UNO3�3 ABB-Power-One/Aurora/PVI/TRIO/UNOEasy Installation Termination Addressing InterfaceYesSwitchYesRS485Select

Pagina 147

230SOCOMECSOCOMEC Sunsys B20E77 SOCOMEC77�1 SOCOMEC Sunsys B20EEasy Installation Termination Addressing InterfaceNo Yes YesRS485Selection available u

Pagina 148 - 48 Lut - Pyranometer

231SOCOMECSOCOMEC Sunsys B20EConnect the inverters to each other•Where to connect: Terminal strip inside the inverter•5-wire cablingProcedure•Open

Pagina 149 - 49 Mastervolt

232SOCOMECSOCOMEC Sunsys B12/B3077�2 SOCOMEC Sunsys B12/B30Easy Installation Termination Addressing InterfaceNoYesYesRS485Selection available under S

Pagina 150 - ► 4 ► 3

233SOCOMECSOCOMEC Sunsys B12/B30Procedure1. Open the inverter according to the inverter‘s instructions.2. Insert the RJ45 plug into the RJ45 socket

Pagina 151 - 50 Mitsubishi

234SolarEdgeSolarEdge78 SolarEdge78�1 SolarEdgeEasy Installation Termination Addressing InterfaceNo Switch NoRS485Overview•Integrated interface•Whe

Pagina 152 - Mitsubishi

235SolarEdgeSolarEdgeProcedure1. Open the inverter as shown in the inverter's instructions.2. Pull the free wires through the wire opening in t

Pagina 153 - 51 Motech

236SolarMaxSolarMax – S, C, MT, P, TS, TS-SV and HT- series79 SolarMax79�1 SolarMax – S, C, MT, P, TS, TS-SV and HT- seriesEasy Installation Terminat

Pagina 154

237SolarMaxSolarMax – S, C, MT, P, TS, TS-SV and HT- seriesCautionRisk of damage to the unit! The Solar-Log™ also has an RJ45 socket, which must never

Pagina 155 - 52 Oelmaier

238SolarMaxSolarMax – S, C, MT, P, TS, TS-SV and HT- seriesConnect the inverters to each other•Connect using the RS485 data cable with an RJ45 plug•

Pagina 156 - Oelmaier

239SolarMax SolarMax – Cx series79�2 SolarMax – Cx seriesEasy Installation Termination Addressing InterfaceYesNoYesRS485Overview•Interface not inte

Pagina 157 - 53 Omnik

24ABBABB-Power-One/Aurora/PVI/TRIO/UNOProcedure1. Open the inverter as shown in the inverter’s instructions.2. Connect terminals +T/R, -T/R and RTN

Pagina 158

240SolarMax SolarMax – Cx seriesConnect the inverters to each other•Connect using a network cable (patch cable)•Where to connect: RJ45 socket inside

Pagina 159 - 54 Omron

241SolarMax SolarMax – E series79�3 SolarMax – E seriesEasy Installation Termination Addressing InterfaceYesNoYesRS485Overview•Interface not integr

Pagina 160 - Inverter settings

242SolarMax SolarMax – E series3. Run the wire from the Solar-Log™ to inverter 1 through the hole for the wire on the bottom of the unit.4. In the i

Pagina 161 - 55 Pairan

243SolarMaxSolarMax via Ethernet interface79�4 SolarMax via Ethernet interfaceEasy Installation Termination Addressing InterfaceNoNoYesLANOverview•I

Pagina 162

244SolaX PowerSolaX Power X180 SolaX Power80�1 SolaX Power X1Easy Installation Termination Addressing InterfaceNo Yes AutomaticRS422The following typ

Pagina 163 - 56 Phoenixtec

245SolaX PowerSolaX Power X1Procedure1. If you make the cable yourself, connect the wires as shown in the following diagram. Solar-Log™ terminal stri

Pagina 164 - Phoenixtec

246SolaX PowerSolaX Power X380�2 SolaX Power X3Easy Installation Termination Addressing InterfaceNo Yes YesRS485The following types are to be connect

Pagina 165 - 57 Phonosolar

247SolaX PowerSolaX Power X3Connect the inverters to each other•Connect using a RJ45 cable.•Where to connect: RJ45 socket.Procedure 1. Insert the s

Pagina 166 - ► 4 B/Data

248SolectriaSolectria >9k81 Solectria81�1 Solectria >9kEasy Installation Termination Addressing InterfaceNo Yes YesRS485The following types ar

Pagina 167 - ► 4 ► PIN 3 (B)

249SolectriaSolectria >9kConnect the inverters to each other•Connect with a shielded twisted-pair cable.•Where to connect: Terminal strip inside

Pagina 168 - Platinum (formerly Diehl Ako)

25Advanced EnergyAdvanced Energy - AE-14 Advanced Energy4�1 Advanced Energy - AE-1Easy Installation Termination Addressing InterfaceNoSwitchYesRS485

Pagina 169 - 58�2 Platinum H

250SolectriaSolectria <9k81�2 Solectria <9kEasy Installation Termination Addressing InterfaceNo Yes NoRS485The following types are to be connec

Pagina 170 - Other configurations

251SolectriaSolectria <9kConnect the inverters to each other•Connect using a network cable (patch cable)•Where to connect: RJ45 socket (RJ45 R an

Pagina 171 - 59 Powercom

252SolutronicSolutronic SP25-55 (RS485)82 Solutronic82�1 Solutronic SP25-55 (RS485)Easy Installation Termination Addressing InterfaceNoYesYesRS485Ove

Pagina 172

253SolutronicSolutronic SP25-55 (RS485)Procedure1. Insert the plug into the X2 socket on inverter 1.2. Insert the other end of the wire into the X2

Pagina 173 - Powercom

254SolutronicSolutronic SP100, SP120 (RS485)82�2 Solutronic SP100, SP120 (RS485)Easy Installation Termination Addressing InterfaceNoYesYesRS485Overvi

Pagina 174 - 60 Power-One/Aurora

255SolutronicSolutronic SP100, SP120 (RS485)Procedure1. Insert the plug into the X6 socket on inverter 1.2. Insert the other end of the wire into th

Pagina 175 - Power-One/Aurora

256StecaSteca83 Steca83�1 StecaEasy Installation Termination Addressing InterfaceNoSwitchYesRS485Overview•Integrated interface•Where to connect: RJ

Pagina 176 - 61 PrimeVOLT

257StecaStecaConnect the inverters to each other•Connect using the RS485 data cable with RJ45 plug; Connection cables between the inverters are suppl

Pagina 177 - PrimeVOLT

258StecaSteca (larger than 17k)83�2 Steca (larger than 17k)Easy Installation Termination Addressing InterfaceNoYesYesRS485Overview•Integrated interf

Pagina 178 - 62 PVPowered

259StecaSteca (larger than 17k)Connect the inverters to each otherConnect using •a 2-wire shielded data cable and •4-pin Phoenix Contact Connection

Pagina 179 - PVPowered

26Advanced EnergyAdvanced Energy - AE-1Connect the inverters to each other•Connect using the RS485 data cable with RJ45 plug; Connection cables betwe

Pagina 180 - No - Yes

260SungrowSungrow84 Sungrow84�1 SungrowEasy Installation Termination Addressing InterfaceYes 120 Ω resistor YesRS485Overview•Integrated interface•W

Pagina 181 - 63�1 Q3 (RS485)

261SungrowSungrowSolar-Log™ terminal strip connector RJ45 socket inverterTerminal PIN ► 1 ► 6 (Data +A) ► 4 ► 3 (Data -B)2. Insert the plug into th

Pagina 182 - Q3 (RS485)

262SunpowerSunpower SPR-F-Model with Fronius ComCard85 Sunpower85�1 Sunpower SPR-F-Model with Fronius ComCardEasy Installation Termination Addressing

Pagina 183 - 64 REFUSOL

263SunpowerSunpower SPR-F-Model with Fronius ComCardProcedure1. If you are making the cable yourself, connect the wires as shown in the following dia

Pagina 184 - Connect using

264SunpowerSunpower SPR-M-Model connection using special RS485 piggyback card85�2 Sunpower SPR-M-Model connection using special RS485 piggyback cardE

Pagina 185

265SunpowerSunpower SPR-M-Model connection using special RS485 piggyback cardProcedure1. Pull the free wires through the wire opening in the inverter

Pagina 186 - 65�1 REP

266SunpowerSunpower SPR-M-Model connect with original SMA RS485 piggy back and the SMARS485 data module85�3 Sunpower SPR-M-Model connect with origina

Pagina 187

267SunpowerSunpower SPR-M-Model connect with original SMA RS485 piggy back and the SMARS485 data moduleSolar-Log™ terminal strip connector Inverter te

Pagina 188 - 66 Reverberi

268SunpowerSunpower SPR-M-Model connect with original SMA RS485 piggy back and the SMARS485 data moduleProcedure1. Pull the wire in the inverter thro

Pagina 189 - Reverberi

269SuntechnicsSuntechnics (only Solar-Log 1000 and 2000)86 Suntechnics86�1 Suntechnics (only Solar-Log 1000 and 2000)Note Suntechnics inverters can o

Pagina 190 - 67 Riello

27Advanced EnergyAdvanced Energy - AE-34�2 Advanced Energy - AE-3Easy Installation Termination Addressing InterfaceYesTerminating plugYesRS485Select

Pagina 191

270SuntechnicsSuntechnics (only Solar-Log 1000 and 2000)Connecting inverters to each other (only Solar-Log1000 and 2000)•Connection is made only with

Pagina 192 - 68 SALICRU

271SuntiguaSuntigua87 Suntigua87�1 SuntiguaEasy Installation Termination Addressing InterfaceNo DIP switch YesRS485Overview•Integrated interface•Wh

Pagina 193

272SuntiguaSuntiguaProcedure1. Open the inverter as shown in the inverter's instructions.2. If you are making the cable yourself, connect the w

Pagina 194 - 68�2 SALICRU EQXLV

273SunvilleSunville88 Sunville88�1 SunvilleEasy Installation Termination Addressing InterfaceYesYesNoRS422Overview•Interface not integrated; Retrofi

Pagina 195 - 69 Samil Power

274SunvilleSunvilleProcedure1. Open the inverter as shown in the inverter's instructions.2. Pull the free wires through the wire opening in the

Pagina 196

275SunwaysSunways - AT/NT/PT 89 Sunways89�1 Sunways - AT/NT/PT Easy Installation Termination Addressing InterfaceYesYesYesRS485Overview•Integrated i

Pagina 197 - 70 Santerno

276SunwaysSunways - AT/NT/PT Connect the inverters to each other•Connect using a 2 wire, shielded data cable•Where to connect: Terminal strip inside

Pagina 198 - Santerno

277Sustainable EnergySustainable Energy90 Sustainable Energy90�1 Sustainable EnergyEasy Installation Termination Addressing InterfaceNo Terminating p

Pagina 199 - 71 Schneider Electric

278Sustainable EnergySustainable EnergyProcedure1. Connect terminal 2 (A out) on inverter 1 to terminal 4 (A in) on inverter 2.2. Connect terminal 1

Pagina 200 - ► 6 ► T

279TBEATBEA91 TBEA91�1 TBEAEasy Installation Termination Addressing InterfaceNo 120 Ω resistor YesRS485Overview•Integrated interface•Where to conne

Pagina 201 - ► 4 ► 6

28Advanced EnergyAdvanced Energy - AE-3On the sockets „RS485 OUT“ with REFUSOL round plugs bypass the connections PIN1 to PIN2 and PIN3 to PIN4.6. Cl

Pagina 202 - ► 3 ► 8

280TBEATBEAProcedure1. Insert the round plug into the COM round socket 1 on inverter 12. Connect additional inverters to each other according to the

Pagina 203 - Schneider Electric

281TrannergyTrannergy92 Trannergy92�1 TrannergyEasy Installation Termination Addressing InterfaceNo Yes NoRS485Overview•Interface not integrated; Re

Pagina 204 - 72 Schüco

282TrannergyTrannergyNoteOnly connect inverter using the RS485/422 B/C interface.Procedure1. Open the inverter as shown in the inverter's instru

Pagina 205

283VaillantVaillant – auroPOWER VPI /1 and VPI (RS485)93 Vaillant93�1 Vaillant – auroPOWER VPI /1 and VPI (RS485)Easy Installation Termination Addres

Pagina 206 - 72�2 IPE CT series

284VaillantVaillant – auroPOWER VPI /1 and VPI (RS485)Connect the inverters to each other•Connect using a 2 wire, shielded data cable•Where to conne

Pagina 207 - ► 3 B (Data-) ► 4 B (Data-)

285ValeniaValenia94 Valenia94�1 ValeniaEasy Installation Termination Addressing InterfaceNo Yes YesRS485Overview•Integrated interface•Where to conn

Pagina 208 - 72�3 IPE SN series

286ValeniaValeniaConnect the inverters to each otherThe wiring is done using a•self-made connection cable and terminal block connector.•Where to con

Pagina 209

287Varta Engion Battery SystemVarta Engion Battery System95 Varta Engion Battery System95�1 Varta Engion Battery SystemEasy Installation Termination

Pagina 210 - ► 1 ► 6 (B)

288Varta Engion Battery SystemVarta Engion Battery SystemConnect the consumption meter to the Solar-Log™�The wiring is done using a•RS485 or•S0 inte

Pagina 211

289VectronVectron96 Vectron96�1 VectronInverters manufactured by Bonfiglioli Vectron GmbH were listed under „Vectron“ up to firmware version 3.1.2.

Pagina 212 - 73 Shindengen

29Advanced EnergyAdvanced Energy - AE-TX4�3 Advanced Energy - AE-TXEasy Installation Termination Addressing InterfaceNo Jumper YesRS485Select “PVPowe

Pagina 213 - Shindengen

290VisionVision Multitracker97 Vision97�1 Vision MultitrackerEasy Installation Termination Addressing InterfaceNoDIP switchYesRS485Select “Vision” du

Pagina 214 - 74�1 SIEL (single phase)

291VisionVision MultitrackerProcedure1. If you are fabricating the cable yourself, connect the wires as shown in the following diagram.Solar-Log™ ter

Pagina 215 - ► 4 Data- ► R

292VisionVision Singletracker97�2 Vision SingletrackerEasy Installation Termination Addressing InterfaceNoDIP switchYesRS485Select “Vision SM” during

Pagina 216

293VisionVision SingletrackerProcedure1. If you are fabricating the cable yourself, connect the wires as shown in the following diagram.Solar-Log™ te

Pagina 217 - 75 Siemens

294VoltwerkVoltwerk (only Solar-Log 1000 and 2000)98 Voltwerk98�1 Voltwerk (only Solar-Log 1000 and 2000)Note Voltwerk inverters can only be connecte

Pagina 218 - Pin 3 Pin 4

295VoltwerkVoltwerk (only Solar-Log 1000 and 2000)Connecting inverters to each other (only Solar-Log 1000 and 2000)•Connection is made only with a re

Pagina 219

296WINAICOWINAICO99 WINAICO99�1 WINAICOEasy Installation Termination Addressing InterfaceNoSwitchYesRS485•Interface not integrated; Retrofit RS485 i

Pagina 220 - 76�1 Overview

297WINAICOWINAICOExample - Communication address 3:OnOffDIP switchExample - Communication address 4:OnOffDIP switchExample - Communication address 5:O

Pagina 221

298WINAICOWINAICOSolar-Log™ terminal strip connector Inverter terminal stripTerminal Terminal ► 1 ► R+ ► 4 ► R- ► 5 ► T+ ► 6 ► T-4. If only one i

Pagina 222

299WürthWürth SolarStar-Series100 Würth100�1 Würth SolarStar-SeriesEasy Installation Termination Addressing InterfaceYesNoYesRS485Select “SolarMax” d

Pagina 223

3 Table of Contents1 Connections �������������������������������������������������������������������������������������������������������������������1

Pagina 224 - RS485 data module

30Advanced EnergyAdvanced Energy - AE-TXProcedure1. Open the inverter as shown in the inverter‘s instructions.2. Pull the free wires through the wir

Pagina 225

300WürthWürth SolarStar-SeriesProcedure1. If you are making the cable yourself, connect the wires as shown in the following diagram:Solar-Log™ termin

Pagina 226 - 76�4 SMA Bluetooth mode

301YaskawaYaskawa101 Yaskawa101�1 YaskawaEasy Installation Termination Addressing InterfaceNo Yes YesRS485Overview•Integrated interface•Where to co

Pagina 227

302YaskawaYaskawaConnect the inverters to each otherThe inverters are connected together using the RS485 interface. Refer to the manufacturer's i

Pagina 228 - 76�6 SMA Speedwire

303Zentral Solar Deutschland ZSDZentral Solar Deutschland ZSD (RS485)102 Zentral Solar Deutschland ZSD102�1 Zentral Solar Deutschland ZSD (RS485)Easy

Pagina 229 - SMA Speedwire

304Zentral Solar Deutschland ZSDZentral Solar Deutschland ZSD (RS485)Connect the inverters to each other•Connect using a network cable (patch cable)•

Pagina 230 - 77 SOCOMEC

305Zentral Solar Deutschland ZSDZentral Solar Deutschland ZSD - zentralpower102�2 Zentral Solar Deutschland ZSD - zentralpowerEasy Installation Termin

Pagina 231

306ZeversolarZeversolar103 Zeversolar103�1 ZeversolarEasy Installation Termination Addressing InterfaceNoYesNoRS422Overview•Interface integrated.•W

Pagina 232 - 77�2 SOCOMEC Sunsys B12/B30

307ZeversolarZeversolarProcedure1. If you are making the cable yourself, connect the wires as shown in the following diagram:Solar-Log™ terminal stri

Pagina 233

308AppendixSMA mixed wiring104 Appendix104�1 SMA mixed wiringFigure 16: SMA mixed wiring

Pagina 234 - 78 SolarEdge

309AppendixInterconnection of Kaco Powador inverters104�2 Interconnection of Kaco Powador invertersFigure 17: Interconnection of Kaco Powador inverter

Pagina 235

31AEGAEG PS5 AEG5�1 AEG PSEasy Installation Termination Addressing InterfaceNoYesNoRS422Select “AEG-PS” during the inverter detectionOverview•Inter

Pagina 236 - 79 SolarMax

310List of figuresInterconnection of Kaco Powador inverters105 List of figuresFigure 1: RJ45 plug pin assignments ...

Pagina 237 - Wiring the C-series

The copyright of these instructions remains with the manufacturer. No part of these instructions may be may be reproduced in any form or processed, du

Pagina 238

32AEGAEG PSNoteOnly connect inverter using the RS485/422 B/C interface.Procedure1. Open the inverter as shown in the inverter's instructions.2.

Pagina 239 - 79�2 SolarMax – Cx series

33AEGAEG Protect5�2 AEG ProtectEasy Installation Termination Addressing InterfaceNo Terminating plug nenRS485Select “AEG-Protect” during the inverter

Pagina 240

34AEGAEG ProtectConnect the inverters to each other•Connect using a network cable (patch cable)•Where to connect: 2 RJ45 sockets on the right on the

Pagina 241 - 79�3 SolarMax – E series

35AlbatechAlbatech APL Trifase 15 / 206 Albatech6�1 Albatech APL Trifase 15 / 20Easy Installation Termination Addressing InterfaceNo Jumper YesRS485

Pagina 242

36AlbatechAlbatech APL Trifase 15 / 20Procedure1. Switch off the inverters and Solar-Log™2. Unscrew the side cover as shown in the inverter‘s instru

Pagina 243

37AlbatechAlbatech APL Monofase6�2 Albatech APL MonofaseEasy Installation Termination Addressing InterfaceNo Jumper YesRS485APL Monofase 2�0/3�0/4�0/

Pagina 244 - 80 SolaX Power

38AlbatechAlbatech APL MonofaseConnect the inverters to each other•Connect using a 3 wire, shielded data cable•Where to connect: on the upgraded RS4

Pagina 245 - SolaX Power

39ALPHA-SOLALPHA-SOL7 ALPHA-SOL7�1 ALPHA-SOLEasy Installation Termination Addressing InterfaceNoSwitchYesRS485Overview•Interface not integrated; Re

Pagina 246 - 80�2 SolaX Power X3

4 8�2 AROS Solar Technology (RS485) ����������������������������������������������������������������������������������������������������������������

Pagina 247

40ALPHA-SOLALPHA-SOLExample - Communication address 3:OnOffDIP switchExample - Communication address 4:OnOffDIP switchExample - Communication address

Pagina 248 - 81 Solectria

41ALPHA-SOLALPHA-SOLSolar-Log™ terminal strip connector Inverter terminal stripTerminal Terminal ► 1 ► R+ ► 1 ► T+ ► 4 ► R- ► 4 ► T-4. If only on

Pagina 249 - Solectria >9k

42AROS Solar TechnologyAROS Solar Technology (RS422)8 AROS Solar Technology8�1 AROS Solar Technology (RS422)Easy Installation Termination Addressing

Pagina 250 - 81�2 Solectria <9k

43AROS Solar TechnologyAROS Solar Technology (RS422) Note Only connect inverter using the RS485/422 B /C interface� Procedure1. If you are making the

Pagina 251 - Solectria

44AROS Solar TechnologyAROS Solar Technology (RS485)8�2 AROS Solar Technology (RS485)Easy Installation Termination Addressing InterfaceNo Yes NoRS485

Pagina 252 - 82 Solutronic

45AROS Solar TechnologyAROS Solar Technology (RS485)Procedure1. Open the inverter as shown in the inverter's instructions.2. Connect terminals

Pagina 253

46AstronergyAstronergy9 Astronergy9�1 AstronergyEasy Installation Termination Addressing InterfaceNo - YesRS485Select „Astronergy“ during the invert

Pagina 254 - ► 4 ► 4 - Data

47AstronergyAstronergyAllocate communication address•Recommendation: Continuous numbering starting with 1.•Address range: 1 - 125 •Setting: Using t

Pagina 255

48AtenAten10 Aten10�1 AtenEasy Installation Termination Addressing InterfaceNo - NoRS485Overview•Integrated interface•Where to connect: RJ14 socket

Pagina 256 - 83 Steca

49AtenAtenConnect the inverters to each other•Connect using a 2 wire, shielded data cable•Where to connect: RJ14 sockets.Procedure 1. Open the inve

Pagina 257

5 18 Danfoss ���������������������������������������������������������������������������������������������������������������������������7018�1 Danfos

Pagina 258 - 83�2 Steca (larger than 17k)

50BenningBenning11 Benning11�1 BenningEasy Installation Termination Addressing InterfaceNoNoYesLANOverview•Integrated interface•The inverter'

Pagina 259

51BenningBenningDetection from the Solar-Log™•For the detection on the Solar-Log™ , select "Benning" as the inverter manufacturer in the Co

Pagina 260 - 84 Sungrow

52Bonfiglioli (formerly Vectron)Bonfiglioli12 Bonfiglioli (formerly Vectron)12�1 BonfiglioliEasy Installation Termination Addressing InterfaceNo DIP s

Pagina 261

53Bonfiglioli (formerly Vectron)BonfiglioliConnect the inverters to each other•Where to connect: Terminal strip on the inverter•3-pin wiringProcedur

Pagina 262 - 85 Sunpower

54Carlo GavazziCarlo Gavazzi - ISMG model13 Carlo Gavazzi13�1 Carlo Gavazzi - ISMG modelEasy Installation Termination Addressing InterfaceNo - NoRS4

Pagina 263

55Carlo GavazziCarlo Gavazzi - ISMG modelConnect the inverters to each other•Connect using a network cable (patch cable)•Where to connect: RJ45 sock

Pagina 264

56Carlo GavazziCarlo Gavazzi - HINRG model13�2 Carlo Gavazzi - HINRG modelEasy Installation Termination Addressing InterfaceNo DIP switch YesRS485 Se

Pagina 265 - Sunpower

57Carlo GavazziCarlo Gavazzi - HINRG modelProcedure1. Open the inverter as shown in the inverter's instructions.2. If you are making the cable

Pagina 266 - Resistor jumper

58Chint PowerChint Power (CSP SC and CSP SCE to 20k)14 Chint Power14�1 Chint Power (CSP SC and CSP SCE to 20k)Easy Installation Termination Addressin

Pagina 267 - Figure 7: Jumper SMA

59Chint PowerChint Power (CSP SC and CSP SCE to 20k)ProcedureCautionRisk of damage to the unit! The Solar-Log™ also has an RJ45 socket, which must nev

Pagina 268

6 27�2 Eltek central inverter ����������������������������������������������������������������������������������������������������������������������

Pagina 269 - 86 Suntechnics

60Chint PowerChint Power (CPS 20k+)14�2 Chint Power (CPS 20k+)Easy Installation Termination Addressing InterfaceNo Yes YesRS485Overview•Integrated i

Pagina 270 - Suntechnics

61Chint PowerChint Power (CPS 20k+)Procedure1. Insert the RJ45 plug into any RJ45 socket on inverter 1.2. Insert the other end of the wire into any

Pagina 271 - 87 Suntigua

62Chint PowerChint Power Modbus14�3 Chint Power ModbusEasy Installation Termination Addressing InterfaceNo No YesRS485The following types are to be c

Pagina 272 - Suntigua

63Chint PowerChint Power ModbusProcedure1. If you are making the cable yourself, connect the wires as shown in the following diagram:Solar-Log™ termi

Pagina 273 - 88 Sunville

64CMSCMS15 CMS15�1 CMSEasy Installation Termination Addressing InterfaceNo DIP switch YesRS485Overview•Integrated interface•Where to connect: Term

Pagina 274 - Sunville

65CMSCMSProcedure1. Open the inverter as shown in the inverter's instructions.2. If you are making the cable yourself, connect the wires as sho

Pagina 275 - 89 Sunways

66ConergyConergy (only Solar-Log 1000 and 2000)16 Conergy16�1 Conergy (only Solar-Log 1000 and 2000)Note Conergy inverters can only be connected to t

Pagina 276

67ConergyConergy (only Solar-Log 1000 and 2000)Connecting inverters to each other (only Solar-Log1000 and 2000)•Connection is made only with a ready-

Pagina 277 - 90 Sustainable Energy

68CyberPowerCyberPower17 CyberPower17�1 CyberPowerEasy Installation Termination Addressing InterfaceNo Yes YesRS485Overview•Integrated RS485 interf

Pagina 278 - Sustainable Energy

69CyberPowerCyberPowerConnect the inverters to each other•Connect using a network cable (patch cable).•Where to connect: RJ45 socket on the outside

Pagina 279 - 91�1 TBEA

7 37 Growatt�������������������������������������������������������������������������������������������������������������������������� 11837�1 Growat

Pagina 280

70DanfossDanfoss18 Danfoss18�1 DanfossEasy Installation Termination Addressing InterfaceYesConnection plugNoRS485Overview•Integrated interface•Whe

Pagina 281 - 92 Trannergy

71DanfossDanfoss3. If only one inverter is to be connected this must be terminated. Insert the supplied connection plug into any free RJ45 socket on

Pagina 282

72DeltaDelta (RS485)19 Delta19�1 Delta (RS485)Easy Installation Termination Addressing InterfaceYesResistorYesRS485Overview•Integrated interface•Wh

Pagina 283 - 93 Vaillant

73DeltaDelta (RS485)2. Insert the RJ45 plug into the RJ45 socket on the inverter.3. If only one inverter is connected this must be terminated. Inser

Pagina 284 - Vaillant

74Diehl AkoDiehl Ako20 Diehl Ako20�1 Diehl AkoDiehl Ako inverters have been listed as „Diehl Ako“ in our firmware up to version 3.1.1. Starting with

Pagina 285 - 94 Valenia

75EatonEaton21 Eaton21�1 EatonEasy Installation Termination Addressing InterfaceNoYesNoRS422Overview•Interface not integrated; Retrofit RS485 inter

Pagina 286

76EatonEatonNoteOnly connect inverter using the RS485/422 B/C interface.Procedure1. Open the inverter as shown in the inverter's instructions.2.

Pagina 287 - No No Yes

77EEIEEI22 EEI22�1 EEIEasy Installation Termination Addressing InterfaceNoNoYesLANOverview•Integrated interface•The inverter‘s IP address has to be

Pagina 288 - The wiring is done using a

78EffektaEffekta23 Eekta23�1 EektaEasy Installation Termination Addressing InterfaceNoJumperYesRS485Select "Effekta ES" during the invert

Pagina 289 - 96 Vectron

79EffektaEffekta3. If only one inverter is to be connected this must be terminated. Set the jumper on the RS485 interface card to ON.4. Close the in

Pagina 290 - 97 Vision

8 47 Kyocera Inverter/Battery System �����������������������������������������������������������������������14647�1 Kyocera Inverter/Battery System

Pagina 291

80EffektaEffekta KS Multitracker23�2 Eekta KS MultitrackerEasy Installation Termination Addressing InterfaceNoDIP switchYesRS485Select “Effekta KS”

Pagina 292 - 97�2 Vision Singletracker

81EffektaEffekta KS MultitrackerProcedure1. If you are fabricating the cable yourself, connect the wires as shown in the following diagram.Solar-Log™

Pagina 293

82EffektaEffekta KS Singletracker23�3 Eekta KS SingletrackerEasy Installation Termination Addressing InterfaceNoDIP switchYesRS485Select “Effekta KS

Pagina 294 - 98 Voltwerk

83EffektaEffekta KS SingletrackerProcedure1. If you are fabricating the cable yourself, connect the wires as shown in the following diagram.Solar-Log

Pagina 295 - Voltwerk

84EnfinityEnfinity24 Enfinity24�1 EnfinityEasy Installation Termination Addressing InterfaceNo - YesRS422Overview•Integrated interface•2 RJ11 sockets

Pagina 296 - 99 WINAICO

85EnfinityEnfinityConnect the inverters to each other•Wiring using the RJ11 cable•Where to connect: RJ11 socketsProcedure 1. Open the inverter as s

Pagina 297

86EHEEHE N1k5TL to N50kTL25 EHEEhe offers three wiring options for their various models. Some models can be connected using a bus. Please note that th

Pagina 298

87EHEEHE N1k5TL to N50kTLProcedure•If you are making the cable yourself, connect the wires as shown in the following diagram:Solar-Log™ terminal stri

Pagina 299 - 100 Würth

88EHEEHE N10k to N100k25�2 EHE N10k to N100kEasy Installation Termination Addressing InterfaceNo Yes YesRS485The following types are to be connected

Pagina 300 - Würth SolarStar-Series

89EHEEHE N10k to N100kConnect the inverters to each other•Connect with a shielded twisted-pair cable.•Where to connect: Terminal strip inside the in

Pagina 301 - 101 Yaskawa

9 57�1 PhonoCube 7�2 (Battery Hybrid System) �������������������������������������������������������������������������������������������������������

Pagina 302

90EHEEHE N250k to N500k-TL25�3 EHE N250k to N500k-TLEasy Installation Termination Addressing InterfaceNo Yes YesRS485The following types are to be co

Pagina 303 - ► 4 ► 8

91EHEEHE N250k to N500k-TLProcedure•If you make the cable yourself, connect the wires as shown in the diagram: Terminal strip inside the first inverte

Pagina 304 - Zentral Solar Deutschland ZSD

92EKO EnergyEKO Energy26 EKO Energy26�1 EKO EnergyEasy Installation Termination Addressing InterfaceNo Yes YesRS485Overview•Integrated interface•Wh

Pagina 305 - ► 4 ► 3 (-)

93EKO EnergyEKO EnergyProcedure1. Insert the round plug into any round socket on inverter 1.2. Insert the other end of the cable into any round sock

Pagina 306 - 103 Zeversolar

94EltekEltek27 Eltek27�1 EltekEasy Installation Termination Addressing InterfaceNo Yes YesRS485Overview•Integrated interface•Where to connect: Term

Pagina 307 - Zeversolar

95EltekEltekOther configurations•Activate the RS485 interface Using the inverter operating display.NotePay particular attention to the instructions i

Pagina 308 - 104 Appendix

96EltekEltek central inverter 27�2 Eltek central inverter Easy Installation Termination Addressing InterfaceNo DIP switch YesRS485Select "Eltek

Pagina 309

97EltekEltek central inverter Other configurations•Activate the RS485 interface Using the inverter operating display.NoteAddress settings: from inver

Pagina 310 - 105 List of figures

98Europa-Solar AGEuropa-Solar AG28 Europa-Solar AG28�1 Europa-Solar AGEasy Installation Termination Addressing InterfaceNoYesNoRS422Overview•Integra

Pagina 311

99Europa-Solar AGEuropa-Solar AGSolar-Log™ terminal strip connector RJ45 inverterTerminal PIN ► 1 ► Pin 3 ► 4 ► Pin 6 ► 5 ► Pin 1 ► 6 ► Pin 23. I

Comentarios a estos manuales

Sin comentarios